San Mateo Storm Drain Replacement Project Phase II
San Mateo, California
_________________
|
![]()
![]()
PROJECT EXPERIENCE
|
Summit Associates provided inspection services for the installation of 36”, 30”, and 24” storm drains on residential streets in the City of San Mateo. The project included excavation, setting pipe to grade, installing electrical conduit in the joint trench, backfilling, manhole installation, relocation of water services and sanitary sewer lines, drainage inlets, and paving. Summit Associates was a sub consultant on this project. |